May 5, 2024ciltugOva HEPP Project (3x4.5 MW)Ova HEPP Project (3×4.5 MW) CLIENT: GLOBAL Hydro Enerji Hizmetleri A.Ş. SCOPE OF WORK: Kaplan Turbine Stationary Accessories Wicket Gate Ring:Ø4880/3354 – weight:9,716kg/set Bearing Housing: Ø2177 – weight:2,620kg/set Discharge Ring:Ø3930 h:1093mm – weight: 7,185kg/set D.T Cone: Ø3730/3526 – weight:7,095kg/setRead more
May 5, 2024ciltugCeyhan HEPP Project (6x10 MW)Ceyhan HEPP Project (6×10 MW) CLIENT: Alstom Power / Austria SCOPE OF WORK: Fabrication of 6 draft tubes, 6 sets of embedded steel parts and 2 sets of counterweights.Read more
May 5, 2024ciltugAkköy HEPP Project (3×34,5 MW)Akköy HEPP Project (3×34,5 MW) CLIENT: Voith Siemens Hydro Power Generation / Austria SCOPE OF WORK: Fabrication of 3 spiral cases, stay rings and installation materials and delivery to the Akköy site.Read more
May 5, 2024ciltugKuşluk II HEPP ProjectKuşluk 2 HEPP Project CLIENT: Andritz Hydro Ltd.Şti., Ankara / Türkiye SCOPE OF WORK: Fabrication of 2 units of distributor pipes, inlet transition pieces, turbine pit liners and parts.Read more
May 5, 2024ciltugBoyabat HEPP Project (3x170 MW)Boyabat Dam and HEPP (3×170 MW) CLIENT: Doğuş İnşaat ve Tic. A.Ş. SCOPE OF WORK: Fabrication and installation of hydro-mechanical equipment.Read more
May 5, 2024ciltugAkköy HEPP Suction PipeAkköy HEPP Draft Tube CLIENT: Voith Siemens Hydro Power Generation SCOPE OF WORK: Fabrication of 3 draft tube elbows and installation materials and delivery to the Akköy site. (Ø1780 / 5200×1220 mm)Read more
May 5, 2024ciltugKeklicek HEPP ProjectKeklicek HEPP Project CLIENT: H.G.M. Enerji İnşaat Ltd. Şti. / Türkiye SCOPE OF WORK: Fabrication and installation of penstock and hydro-mechanical equipment.Read more
May 5, 2024ciltugBorçka-Muratlı HEPP ProjectBorçka-Muratlı HEPP Project CLIENT: Voith Siemens Hydro Power Generation SCOPE OF WORK: Fabrication and supply of 2 draft tubes of Øi=5.630 / Ø4.991 mm.Read more
May 5, 2024ciltugAkköy 2 HEPP (2×116 MW, 2011)Akköy 2 HEPP (2×116 MW, 2011) CLIENT: Kolin İnşaat Turizm Sanayi ve Tic. A.Ş. SCOPE OF WORK: Penstock fabrication and installation works.Read more
May 5, 2024ciltugBatman Dam & HEPP (3x63 MW)Batman Dam and HEPP (3×63 MW) CLIENT: General Directorate of State Hydraulic Works (DSİ) SCOPE OF WORK: Fabrication and installation of all permanent hydro-mechanical equipment, gates, trash racks, penstocks, bifurcation pipes, cranes, slide and cone valves. Ø9,5 m / 3xØ5 m trifurcation, Ø5…Read more