Wind Energy Turbine Generators, Tower Manufacturing and Installation Works

Reference Projects

  • Nordex Energy GmbHSincik RES Projesi – 11 Adet Kule, Tip: N100, R80 MT5.1 EC 2a
  • LagerweySystem BV – 2 Adet Kule ve İç Aksamı, Tip: L100; 96.7 M
  • Baykal Enerji4 Adet Kule ve İç Aksamı, Tip: 68M HH, TC3
  • Amperax / Meriç Enerji2 Adet Kule ve İç Aksamı, Tip: 92M / 3MW
  • Areva Wind GmbHTG01 Tip Nakliye Karkası, Ağırlık: 196 ton

Quality Control

The manufacturing and assemblies in these factories are carried out by our experienced technical staff in accordance with international quality and standards and Quality Management Systems ISO 9001:2015. In addition to this standard, our technical team is equipped with EN ISO 3834-2 Fusion Welding of Metallic Materials Management Quality Requirements System, ASME U&S Onayı’na, ISO 14001:2004 ve OHSAS 18001:2007 He has Occupational Health Safety and Environmental Management System certificates.

Automatic Surface Cleaning, Sand Blasting and Painting Booths

Sand Blasting CabinetSize: 8 x 30.5 x 6.5mEquipment: Automatic External Surface Blasting Equipment with Turbine, Capacity: 80 m per hour2Manual Internal Surface Blasting Equipment, 4 sets, Capacity: 50 m per hour2

Painting BoothEbat: 10 x 30.5 x 6.5 m Equipment: Heating Device, Circulation Device, Lighting and PLC System

PLC Controlled Painting and Curing Cabinets

Cabin Size (G x U x Y) 10 x 30.5 x 6.5 m Equipment: Heating Device, Circulation Device, Lighting and PLC System

  • Steel wind tower production with a capacity of 80 towers per year (up to 105 tons per piece)

  • Rotor houses

  • Main carcasses for stator structures and offshore rigs

Mekanik ve Elektriksel İç Aksamının Kurulumu

The installation of all mechanical and electrical internal components, including platforms, wiring, service elevators, stairs, is carried out by our experienced installation team in our factory and at the construction sites where the project takes place.

Storage Area

80 tower sections were stored in the form of a single floor stack consisting of shells, and 160 tower sections were stored in the form of a double-storey stack.

  • Generator Brake discs & Stator plates

  • Turbine transportation frames

  • Anchor cages c/w flanges and foundation rings

Load Release and Fixing Flanges

Load spreading equipment that distributes the load evenly during the transport and installation of tower sections, as well as the fixing flanges and foundation rings that connect the tower to its foundation, are also manufactured in our factory.

Delivery and Assembly

Completed tower sections are delivered to the project site with special transport vehicles, and installation is carried out on site by our experienced teams.

  • Turbine Blade hubs

  • Mechanical internal components and platforms (kit sets)

  • Installation of the electrical and mechanical internal accessories of the wind generator in the installation area ready for operation.

Çiltuğ Isi Sanayi ve Tic, which is currently a major supporter and investor of renewable energy. A.Ş, 7.000 m designed for the activities in the sector, especially for the production of wind towers2; closed area, 25.000 m2; it started with the construction of the Wind Tower and Accessories Factory built on an open area.