CLIENTGeneral Directorate of State Hydraulic Works of Turkey (DSİ)
PROJECTBatman Dam & HEPP
LOCATIONSİLVAN-DİYARBAKIR / TÜRKİYE
CONTRACTOROnar-Günsayıl İnşaat / Türkiye SUBCONTRACTOR: Çiltuğ Isı San. ve Tic. A.Ş.
CLIENT:
General Directorate of State Hydraulic Works of Turkey (DSİ)
SCOPE:
Fabrication and erection of all hydro- mechanical equipment, Intake Gates, Trashracks, Penstocks, Tri-Furcation and bifurcation branch pipes, gantry cranes, slide and conical valves.
Ø9,5 m / 3xØ5 m triple branch,
Ø5 m/Ø4.5m/Ø2.6m double branch,
Ø2,6m / Ø2 m / Ø1,5m Branches,
Steel Lining and Penstocks: 3,500 tons
Radial gates: 6 no’s, 1,600 tons
Trashracks, stoplogs service gates and other equipment: 1,900 tons.